- Details
- Published: 21 August 2015 21 August 2015
- Hits: 2618 2618

The worst job so far is done, marking out and cutting plywood baseboards for the raised section, wood chips & dust everywhere. Now they're all in place, at the right height and level. Today is the first day i've really been able to see just how good a tool Anyrail is as I stuck the trackplan onto the new baseboards and it all fitted perfectly. Below you can start to visualise the south end of the station and the viaducts. The boards are not screwed down, i'll keep them loose until the track is down in at least the turntable area where access will be more difficult.
This long term plan is now taking shape. Putting the boards down in the storage section will be easy. Then track laying, electrics etc.
|