Made some decent progress in late September with the wife away and not so much travel. Rather than getting distracted with lots of experimenting with weathering and fitting sound chips etc I tidied up the railway room and focussed on getting some track down in the station area.

IMG 4251 Edited IMG 4249 Edited

The droppers have been soldered and most of the isolated sections have been cut and fitted with Peco isolated track joiners, although i've forgotten a few. Planning of the occupation zones is completed so wiring up shouldn't be such a difficult job as it's been in the past.

 

 

0
0
0
s2smodern